
Institutional · Case Study
Selected professional work showcased for portfolio presentation purposes only.
Project
Sports Academy
Typology
Institutional
Built-up Area
70,000 sq ft
Height
15 m
Floors
3 Floors
Architects
Genesis Planners
Role
Lead Interior Architect
Style
Contemporary
Location
Gachibowli, Hyderabad
01 — Concept
The brief asked for more than a sports facility — it called for a place where elite athletes train, recover and liveunder one continuous architectural idea.
The design extends an existing badminton academy with a proposed academy block, a half-Olympic swimming pool, a 200 m five-lane athletic track, support amenities, commercial space and residential accommodation for students and staff. Every program is choreographed around a shared circulation spine, allowing athletes to flow seamlessly between training, recovery and rest.

The Arrival
A double-height portal in fluted timber, illuminated signage and a wall of champions establishes identity from the first step inside — equal parts arena and gallery.
02 — Planning Strategy
Sustainable site-planning principles drove the master plan — reducing the built footprint, maximising landscaped greens, and stacking specialised programs vertically to release ground for the track, field and outdoor recovery zones.
Three primary zones — existing academy, proposed academy, and commercial block — woven by a central circulation spine.
Direct, conflict-free movement between training halls, recovery, and residential blocks for students & coaching staff.
Stilt for parking, double-height badminton courts above, residential rooms and conference suites stacked overhead.

03 — Design Features
Visual comfort, thermal comfort and heat-gain reduction were addressed through careful orientation, envelope detailing and a holistic energy strategy across the entire campus.
Reduced built footprint, native species, grass pavers.
Recycled wastewater & integrated water-management systems.
Built spaces oriented for thermal & visual comfort, heat-gain reduction.
Renewable technologies integrated holistically across the campus.

Half-Olympic Pool
04 — Technical Coordination
As Lead Interior Architect, my role spanned design development through construction documentation — coordinating drawings across five floors with structural, MEP, acoustics and sports-flooring consultants.





05 — Final Visuals




Project Closeout